Wooden bridge in Rapid City gets overhaul - KOTA Territory News

Wooden bridge in Rapid City gets overhaul

Posted:
By Barrett Phillips

Creek Drive will be closed to all traffic except for those who live on it, as the city puts in a new bridge.

The closure will be for about four months.  The street is expected to reopen by Dec. 15; when the new bridge is finished.

As Cetec Engineering tears down the old wooden bridge they will build a new reinforced concrete bridge.

Minor work will continue off the roadway until May 15 of next year.


Powered by WorldNow

518 St. Joseph St.
Rapid City, SD 57701

Telephone: 605.342.2000
Fax: 605.342.7305

Couldn't find what you were looking for?
Powered by WorldNow
All content © Copyright 2000 - WorldNow and KOTA. All Rights Reserved. For more information on this site, please read our Privacy Policy and Terms of Service.